Yes. Testing can be integrated into the production line, with cans conveyed through the tester and failed cans separated automatically, so testing runs without interrupting the flow of production.
Yes. Testing can be integrated into the production line, with cans conveyed through the tester and failed cans separated automatically, so testing runs without interrupting the flow of production.